Customization: | Available |
---|---|
After-sales Service: | One-Stop Service |
Warranty: | Depend on Mold Life Time |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Product Name | Zinc Alloy Die Casting Parts |
Mold Material | H13,SKD11,DH31-EX,45#,718,etc. |
Cavity | 1*1,1*2,1*4,1*8,1*16,1*32,etc. |
Mold Life Time | Zinc alloy:300K times; Injection molding:500K times; Sheet metal:3000K times |
Size | According to customers' drawings |
According to industry agreement standards | |
Drawing Format | step, dwg, igs, pdf |
Certificates | IS09001:2015 & ISO 14001:2015 & IATF 16949:2016 |
Payment Term | T/T, Paypal |
Quality | 100%inspection before shipping |
Advantage | 21years experience |
Our Equipments
Production Equipment | Qty | Test Equipments | Qty |
Hot chamber zinc alloy die-casting machine | 53 | Video Measurement System | 8 |
Cold chamber aluminum alloy die-casting machine1 | 5 | Pressure Cooker | 1 |
Plastic Injection Machine | 15 | constant temperature and humidity test machine | 1 |
Stamping Machine | 12 | Salt-mist Test Machine | 1 |
CNC Machines | 31 | Coordinate Measurement System | 2 |
EDM Machines | 30 | Ageing Oven | 11 |
High Precision Wire-cut EDM | 4 | Thickness Test Machine | 1 |
CNC Lathe | 2 | Height Circinus | 18 |
Milling EDM Machine | 2 | Hardness Test Machine | 4 |
About US
Patent Certificates
FAQ
Q1.Are you manufacturer?
A:Of course we are.We have our own factor located in A12, No. 2#, 3rd Ind. Zone, Qiaotou Village, Fuyong Town, BaoAn District, Shenzhen, China.
Q2. What kind of production service do you provide?
A:Mold making, die casting, CNC machining, stamping, plastic injection, assembly, and surface treatment.
Q3. How about the lead time?
A:Mold: 25-30days
Mass production: 21days
Q4. How about your quality?
A:We have got ISO9001:2015,ISO14001:2015 and IATF16949 certificates.
We will prepare for bulk orders once the sample is approved.
We will 100% inspect the products before shipment.
Q5. How long should we take for a quotation?
A:After receiving detailed information(your 2D/3D drawings or samples), we will quote you within 3 days.
Q6. What is your quotation element?
A:Drawings or Sample, Material, Finish, and Quantity.
Q7. What is your payment term?
A:Mold: 50% prepaid, balance after sample approval.
Goods:To be negotiated.